Videos

The above video shows how the EZ-Build SIP Blocks fit together and can accommodate a range of small-to-big outdoor projects that require insulation. To complete the build process glue will need to be applied along each spline before assembly and then after assembly, screws must be inserted (on #6 x 1.25” prox 8” spacing) through the OSB into the spline to insure the glue joint is firmly clamped together.

The above video shows how we can help you insulate an existing open stud wall using “Split” SIP blocks.

Lightbulb with the word "Idea" in the center

Ready to Get Started?

We would love to learn more about your project or help turn a dream into reality with the EZ-Build SIP Block. Please complete the Contact Form to start the conversation.

Scroll to Top